ATTN – ACMAL labs kept opened until May 3rd

The ACMAL labs doors at 6th and 7th floor of the M&M building should be kept open during the day as the room temperature is getting too high.
Because the building anual steam maintenance there’s no air circulation in those labs. The steam maintenance is going to be done in May 3rd. Until then, please kept the doors open during this the day.

Sincerely,

Erico Freitas