May be a blown filament. We will check it later this afternoon.
I installed the new Pt/Pd sputter target today.
Surface and Interface Science CH5665/MSE5665
(3 credits)
WF 1-2 p.m., M 1-3 p.m. (lab and analysis)
Learn To
- Understand the physical and chemical processes that influence surface chemistry and growth
- Apply surface science techniques to solve materials problems
- Proper data analysis and interpretation
- Design a project and solve a proposed hypothesis using surface analysis
- Surface analysis methods: spectroscopy and microscopy techniques
- XPS, AES, surface sensitive-FTIR, HREELS, Raman, surface structure (LEED), TPD, AFM and ambient pressure techniques
- Applications in materials science, chemistry, physics, engineering, environmental science, catalysis, semiconductors and related tech industries
The PtPd target wore out this morning. I have a new one on order. In the mean time we are using the iridium target. You won’t be able to tell the difference with the Ir coating.
Please do not electropolish on the weekend alone. Also, if you only occasionally use it please do the work during the week in case there is a problem. We want to avoid equipment breakage.
Also, the LN2 pump gets condensation in it and freezes. If it is working right the hose black hose will freeze and the temp will go down pretty quickly. Turn off the pump and come get me to help if the pump isn’t turning.
I’ve put in call for help. I”ll let you know when its back online.
I’ll be out of town tomorrow through Friday. Back in the office Monday, Oct14th. You’ll be able to reach me by phone, text or email.
Liz and Aleister will be here to coat samples or help with SEMs & AFM.
The ESEM is back online now and ready for use.
The ESEM is down with a blown filament. We will have it back online tomorrow morning.