Tag: Lean

Sustaining Improvement

Sustainment is arguably one of the most challenging parts of a Kaizen, or more, the most challenging part of Post-Kaizen. It can sometimes be very easy to drop a new process when there is stress, even though the old process was stressful as well. However, the old process brought along stress that you became conditioned to, it produced a level of stress you were used to, versus a new stress. This tends to negate all the hard work you put into the Kaizen itself. Processes can be broken down, the improvement measured through its results, but what happens when you revert to old ways as soon as there is resistance? How does one keep themselves from back-sliding after making new improvements?

sustain

Involvement: One vital part of maintaining improvement is engagement of your entire team, the entire workforce involved with the process. Sustaining improvements isn’t the job of one, but it’s accomplished through the work and perseverance of many. When everyone is involved with a process and the completion of that process, then you have many people invested in its sustainment. When there is only one or two out of the whole who are invested in improvement, it becomes easier to revert, as everyone is not on the same page.

involvement

Metrics/Data: Evaluating your improvements and its progression is also important Post-Kaizen. The data and metrics collected through the Kaizen show the improvement itself, and go on to show the improvements growth afterwards. Data and metrics can help with sustainment in that they will show you where improvement is falling-off, or where adjustments need to be made. Part of the services our office provides was implementing a 2,4,6 month check-in for Kaizens, which go over the improvements that had originally been made and the data and metrics collected along the way. This allows everyone to visually see how the metrics flux, and whether the metrics values have gone up or down due to lack of adherence to the sustainment plan, or because the new process needs some PDCA.

mmetrics

Evaluation: Sometimes,  having many action items to complete Post-Kaizen contributes to a lack of sustainment. If one person becomes bogged down with many different tasks to complete, or if many tasks are put into place and later found in need of adjustments, the wheels for back-sliding may have already begun to turn. Having action items completed before the end of the Kaizen gives you time to collect metrics and data for the changes made, and therefore gives you time to evaluate the effects of those changes. If  a large amount of the changes don’t get made, or the changes didn’t have the desired effect, it becomes very tempting to want to go back to the familiar “old-way”. Lean is all about testing the changes made In Real Time, so it’s important to give yourself time to evaluate the changes that are being made, their effects, as well as seeing that implementation doesn’t spread one person too thin. If it appears that one person is overburdened with action items, its okay to take it one item at a time, or to disperse the items in a different manner.

evaluation

Incorporation: Along with involving everyone in a process who has a say, you should also have a plan for incorporating this new improvement and knowledge into everyday culture. When approaching improvement and sustaining it, it’s helpful to have a mindset that revolves around continuous improvement. This allows for new ideas to be given, received, and applied in reaction to results. To help keep the thoughts from, “well, this isn’t working, lets just go back to the old way,” it’s more positive to think “if this doesn’t work, we can find something to try next.” When improvement is blended into one’s daily routine, it becomes easier to train someone who’s new to the process, as well as to hand-off the information down the road. This makes sure that improvements are not only sustained by those who were first involved, but those after as well.

incorporate

Continuous Improvement: Last but not least, improvement rarely is spot-on the first try, meaning Post-Kaizen improvements may not always go smoothly. There may be stress on the new process, unforeseen road bumps, or even resistance to something new. Remember that just because you spent time creating a new process, it does not mean that the new process is set in stone, and it will more-than-likely need improvements of its own. Never be afraid to make tweaks or ask, “how can we make this process even better?” Incremental improvement is just as effective as all other improvement efforts, don’t feel like it all has to be done at once, take the time to make improvements at a sustainable pace.

continuous-improvement

Sustaining improvement is a tricky thing, but it’s a challenge well worth the fight! After all, you’re trying to become more effective in the service and value you provide. I have a lot more to say on the subject, however I will save that for another time. Please feel free to comment with any thoughts or experiences that you have with sustaining improvement!

 

 

 

The Gembas Role in Data Collection

Data collection can be a tricky thing, especially in a Higher Education setting. We tend to have to get creative in identifying what data would be helpful in representing improvement, as well as how we can collect the data using the resources we already have. This need for creative thinking skills tends to make brainstorming a collection plan seem ambiguous and maybe even insignificant at times.

We can easily generate a process map for the current state and future state and then count how many steps were eliminated, but what if five steps were removed, and one was created? It would appear (numerically) as if four steps were removed. Which is true, but how can we account for the process change in the new step? How can we measure that the new process adds more value than the old process? How do we represent the waste of five steps versus one new step? This is where our creative thinking ends and we decide that removing four steps is “good enough.”

In a video I recently watched, Mike Wroblewski, a senior consultant from the Kaizen Institute, shared a little bit about all the things we should consider before we create a data collection plan. The part that really stuck with me was his emphasis on going to the Gemba, the place where work is done, and asking questions. Wroblewski’s video showed me, that you can’t fully grasp the current state until you immerse yourself in the environment of the user, even if it is only observation. Once you’ve gone to the Gemba, it becomes more clear what the steps in the process are. From here you can identify metrics that represent the frequency of an event, such as the number of corrections to file, or that represent importance. For example, how critical is it that this step be in the process at all.

gemba

By now you’re probably thinking, “this is all great, but why do we even care about metrics?” Results. When you think of a research project, you want to know the results. When you missed the ending of a baseball game, you want to know the results. When you hear of someone applying for a new job, you want to hear the results. We as humans are hard wired around, “what happened next?” Lean and Continuous Improvement is no exception to this. When an improvement event is initiated, we soon begin talking about data collection before and after a kaizen so that we have results to showcase the work that was done. Metrics can be the difference between a department hypothetically getting $500 towards improvement efforts or $50,000. Metrics and results drive more people to put in the energy to improve their work from good to great.

This outlook and approach towards data collection is one that our lean practitioners here on campus have been trying to implement more and more, as well creating a more systematic approach towards getting numbers easily, accurately, and that will also provide meaningful data.

 

Wedding Bells Are No Exception

So often we get caught up in our projects: we start them, prioritize them, and then devote all of our attention to them one by one until they’re completed. We very rarely have a single project that is on-going for a long period of time; why is this?

I think it’s because we don’t want lingering work, we thrive off of completion. From that we gain satisfaction and pride in our work.

There is, however, a trade-off for this pride. That is, when we continuously move from one project to the next, seeing each to completion before starting the next, most of us quickly become burned out. When we get burned out we lose our energy and our enthusiasm, as well as become negative, frustrated, and unproductive. That satisfaction we were chasing before no longer sustains us.

Back in February, one of my co-worker’s blogged on incremental improvement, and recently she blogged about Preemptive Improvement. In these blogs, she’s shared how our office has been using small improvements to achieve a high future state and strive for perfection, even when a correction isn’t necessary. These methods are some that I’ve been applying in my own personal life heavily in the last year or so.

Last July I got engaged, we set a date 11 months out and so commenced the wedding planning. For all those who’ve been married, you probably know the magnitude of this task. I’ve always been a “planner,” per say, and I tend to enjoy getting to use my creativity, so from the beginning I’ve been pretty excited about the planning process. However, I know a lot of people who’ve gotten married and I’ve learned that the entire process isn’t always fun, or creative. I also know myself and I tend to go and go and go, and focus on one thing until it’s complete before I’ll start the next; meaning, I tend to burn myself out.

Knowing the planning wouldn’t always play on my interests, and knowing that I sometimes overburden myself were good things to be aware of back in July. Because of this, I was able to plan ahead and use my lean thinking skills to combat potential burnouts or becoming a bridezilla (my worst nightmare). I did this by utilizing the skills I’ve learned here in the Office of Continuous Improvement. I can honestly, say with 10 days left until the wedding, that I’ve only had two “burnouts,” one as a result of over-processing, and the other was out of my control to change.

After talking to multiple soon-to-be wives, I’ve learned that I am the one who’s been the least bit stressed about the planning process as a whole and I believe this is from all of the lean I’ve implemented… From organizing my thoughts via a gigantic affinity diagram, laying out the roles and responsibilities of our family members in a swim lane, using a decision matrix to decide on venues and vendors, ICE prioritization of tasks, plentiful checklists, recognizing when I was over processing, and also taking it one step at a time and remembering that the entire wedding doesn’t need to be planned over-night.

I’ve also gathered that on average, the last three weeks before the wedding tend to be the busiest with wrapping up small details. However, because of the prioritization that we conducted early on, and the small deadlines we set, we were able to spend two of those weeks towards something not related to wedding, and only spend the last week wrapping up details.

34643065_10204681238907051_8619962606741880832_n (1)
This is the original affinity diagram that kicked off the planning (kind of) last August. Things would get added and removed as we moved, but at one point it took up this entire 10 ft wall.

The purpose of today’s blog post is to show you that as long as you learn how to slow down your thinking, anyone can implement and benefit from small improvements striving for perfection.

 

 

 

 

4 things you (probably) didn’t know about a Kaizen event

In the last 10 years we’ve gained a lot of momentum in sharing Lean with the people of this campus; the largest connection has been made through hosting Kaizens, improvement events. However, when hosting a kaizen there’s not always team members that have ever heard of Lean and Continuous Improvement, let alone fully grasp its concepts. This isn’t their fault, how could they possibly understand something they haven’t been exposed to?

That being said, there’s eight things you probably didn’t know about a kaizen event that can help you to understand them a little more, the first four will be covered here:

  1. We’re not here to fix it for you – So often when our office assists with a kaizen, others believe that we are the ones that are going to come up with the solutions. This isn’t the case, the facilitators and coordinators are there to coach the team through a new way of problem solving, so that the team can develop the solutions.
  2. No silent objectors – A whisper can be more damaging than a shout. Meaning, if a team member has an idea, in agreeance  to the conversation or not, and it’s whispered or only kept as a thought, then that may be lost potential. We highly encourage all members of the team to share all of their thoughts and opinions so we can gain all perspectives. I mean, each team member was invited to the kaizen for a reason, right? And just to clarify we don’t encourage shouting, there’s really no need for it in a positive and mutual-respect environment, but shouting your idea is better than not expressing it at all.
  3. Blame the process, not the person – People are out of scope when identifying problems in a process. The process is the way it is, because it was able to be that way. Typically people don’t try to do a bad job, or deliberately cause waste. It’s easy to blame people, but really that person was just a victim to the faults of a process.
  4. It’s okay to disagree, but it’s not okay to be disagreeable – This kind of ties to #2, we encourage ALL opinions to be shared. Including opposing opinions. BUT, there is a difference between a difference of opinion and simply being irritable or challenging to work with.

So there’s four things you probably didn’t know about kaizen events, particularly the culture of a kaizen event. Stay tuned for the next four.

If you’d like to learn more about kaizen events, and how we run things here on campus, consider subscribing to our blog. We aim to get a post up once a week.

Mortgage-Industry-to-Change-URLA-1003-in-2018-1080x675

The Purpose of Lean

The Office of Continuous Improvement had the pleasure of welcoming guest Karyn Ross on Monday afternoon (and on her birthday, no less!). Having her here at Michigan Tech was a wonderful opportunity, as we get to learn more about Lean from another perspective.

While talking with Karyn and students from Leaders in Continuous Improvement, Karyn was asked how to better cultivate a Lean culture, was there certain tools that they should be using. Karyn’s response was not what I expected, but I was also pleasantly intrigued, as she addressed our usage of tools and Lean culture in a way that allowed be to look at Lean in a way I hadn’t previously.

In terms of tools, there are many that we have in order to help us make an improvement, and there tends to be heavy dependency on these tools. However, improvement is more than implementation of just a tool or tools: it’s the combination of principles, practice AND tools that allow us to accomplish an overall purpose. It is the establishment of the purpose that seems to have been forgotten, which means that an important key to improvement has been forgotten as well.

When beginning an improvement event, the first step is to identify and evaluate the current state, when really we should be asking and establishing what our purpose for the improvement is. “What is it we want to accomplish? What do we need to do, in order to make that accomplishment? How can it be done in a way that fulfills our purpose?” Establishing your purpose allows you to be able to define your target of the improvement. Only after the purpose and  your target are established can you truly look at your current state and start to find how to bridge the gaps. Only then can tools be used without creating waste.

In terms of culture, Karyn asked, “What is the purpose of Lean?”  To which the immediate response was the one I had only ever known; “To make all processes more efficient and effective.”

I was taken aback by Karyn, smiling, saying, “Can we flip flop those two?”

What did she mean, to flip the two? In most everything I had read about Lean, all that I had learned through training, the saying was always “efficient” and then “effective”. How could you be effective without being efficient first? Karyn went on to talk about that when a group works towards their purpose, and produces an end result that adds value to their customer, then they are being effective. The more value you produce for the customer, the more effective you are being, and the more you are fulfilling your purpose. Therefore, being more effective allows you to become more efficient, as you fulfill your purpose in the best, Lean way possible.

In all, I think that there is a lot that we can all learn about our purpose within Lean and about our own culture, Karyn more than helped me learn about my own. Towards the end of our visit, Karyn herself was asked what is the purpose of Lean, to which she replied:

“The purpose of Lean, is to help people improve the world.”

Karyn was overall, engaging and knowledgeable, and I wish I had had more time to talk to her. I hope that now, with my new found knowledge about my own purpose within Lean, that I can help other people improve the world, and do so more effectively.

 

 

The Trickiness of Out-of-Scope

One of my first solo kaizens has been with a group of newly trained facilitators, and has gone smoothly so far! I would like to share how during this particular kaizen, I witnessed this group really dig-down and think of tools and ways that would allow them to cover as many aspects of the root cause as possible.

Recently, the IT library help-desk has been working on improving the hardware drop-off process. The process itself had issues such as miscommunication and lack of information and standards. This left the help-desk with no information about the hardware’s progress as well as other issues, such as the customer not knowing how to access what little information there was about their hardware.

One of the challenges of going through this Kaizen was how often certain parts of the process were “Out-of-Scope” due to the process involving many other departments and people. Though IT could do their best to standardize the parts of the process that they were hands on, there was little that could be done at that time in terms of standardizing the process as a whole.

As ways to address communication within IT and the customer, they came up with ideas such as information cards for customers specifically, as well as more details added to the hardware log. These two improvements helped a majority of the process in terms communication all around.

Although it was established earlier that areas of the process that took place in and with other departments was out of scope, the team came up with a fairly simple idea that was still able to address the lack of communication and was able to help bridge between the current improvement and the out-of-scope. Their idea was to create a channel that allowed communication only between the main contacts of IT and the other heads of the process. This way, there’s more effective communication between all groups involved in the process.

It was very exciting and refreshing to see this group take on improvement in a creative way, in which they didn’t let the out-of-scope deter them from improving what they could.

Scheduling of the Library Conference Room

There has been a new Kaizen started here in the Office of Continuous Improvement, and I get to be the PIC for it! The new Kaizen is through the JR Van Pelt and Opie Library. The topic will be based around the scheduling methods of conference room 103 in the Library. Chad Arney, Director of Strategic Initiatives, is the team leader. He has proven to be very knowledgeable, both in the understanding of Library itself and in Google calendar. Andrew Miles (Financial Aid Manager), Briana Tucker (Student Engagement Coordinator), and Lori Weir (Dir Admin Services & Projects) are the three facilitators that have volunteered for this Kaizen. An added bonus, is that they are all outside eyes, and often ask very formidable questions about the process for how to schedule the conference room. Our team members are Annelise Doll and Mia Kemppainen, both employees in the library who know the process inside and out, and work with it on a daily basis.
We held our pre-meeting at the beginning of the March and identified what the problem was exactly. Chad explained the confusion and difficulty there was just to reserve the conference room, which believe me, was very confusing, especially for an outsider looking in. It was a bit unbelievable to see the process that people have to go through to reserve this room. Not only is there a lengthy process, but there is all the potential for other people to be in the room or that another reservation could be made, over-booking your event.
We held our first Kaizen day this past Monday with the whole team together in one room. We were able to create a process map of what people have to do to reserve the room. We were also able to figure out some things in Google calendar that really none of us have really known about before, like knowing who can reserve the room on campus and how Google calendar can accept whether or not the room can be reserved. It was very interesting to learn about these new things I hadn’t known before. We were also able to identify the different things that people struggle with when reserving the room.
Overall, it’s been, and hopefully will continue to be a fun, exciting, and great learning experience.

Lost in Translation – The First Pillar

From a young age we were taught to obey our elders, use our manners, and present ourselves in an appropriate manner. As we got older, more detail was added. Saying “please” and “thank you” wasn’t enough, we also had to treat others how we wanted to be treated, be kind, and help others when they needed it. Everyday, we add a little more detail to all of these areas, we learn a little bit more. What am I describing? Have you caught yourself saying it in your head? If you need to, reread this paragraph slower, then continue on.

Did you catch it now? I’m describing respect. Respect is the foundation to every relationship we have. Whether it be with a spouse, a co-worker, a boss, a friend. The amount of relationships we have, are endless. Respect fuels these relationships and if the respect is lost, then often times so is the relationship (unless you actively try to rebuild it).

Because respect is such a fundamental piece of human nature, I believe this is why Toyota made “Respect” one of it’s two pillars (the other being Continuous Improvement). This pillar is referred to as “Respect for People.” We’ve talked plenty before about respect for people, so instead I want to talk about how “Respect for People,” may have been a false translation when it was translated from Japanese to English.

I’ve been doing lots of  digging lately and I found some pieces written by a man named Jon Miller who summarized that the Japanese phrase, ningensei no soncho (人間性の尊重) was once translated, resulting in the phrase: “Respect for people.” After further translation it was found that the phrase was actually meant to be, “Respect for Humanity,” or “Respect for Human Nature.”

Before I totally throw you off, respect for humanity does indeed include respect for people, but “respect for people” simply doesn’t bring justice to the entirety of Toyota’s pillar. Some parts were lost in translation. When respect for humanity is broken down, it results in three areas: Respect for the workers, Respect for the customers and suppliers, and respect for the environment. All areas that human interaction is involved while producing, or consuming a product.

Respect is a huge part of Lean, and that’s because it’s a huge part of life. Respect goes beyond our interactions between other humans, it involves our relationship with our products, ourselves, our homes, our world. Creating honest emotion, passion, and empowerment. Without respect, lean would fail, just like everything else does. Respect for people is important, but when we expand our respect beyond people, greater things are produced.

Citations:

“Respect For Humanity.” Lean manufacturing – Practical advice, information resourcesand, 2014, www.lean-manufacturing-junction.com/respect-for-humanity.html.

Miller, Jon. “Respect for humanity…of your boss.” Gemba Academy, 10 Aug. 2015, blog.gembaacademy.com/2015/08/10/respect-for-humanity-of-your-boss/.

Lean: Past, Present, and Future

Beginning my learning in the Office of Continuous Improvement, not only did I learn what Lean itself was and what it looked like, but also I began to recognize where it is applicable. (The last part of that sentence is an oxymoron, as Lean is applicable literally everywhere). However, I began thinking about and applying Lean to circumstances from my past, starting to apply it in everything I do now, and applying it in the future.

Before working in the Office of Continuous Improvement here at Michigan Tech, my place of employment was absolutely awful, pretty much to the point of unbearable. For those of us who know what it is like to work at a job that gives absolutely no satisfaction in any shape other than being un-employed, then you know just how depressed it makes you. After being inducted into the Lean culture and environment, I cannot help but to mentally think about how much that company could truly grow and prosper if Lean was truly and wholeheartedly applied. I dream of how the 5 Whys and Swim Lanes and other useful tools of Lean could benefit the company and employees there, and the many problems that never go away. The kinds of issues that myself and others continue to deal with are ones that are chronic; not only in terms of the process, but that there is also an entire lack of safety as well as lack of respect between employees and managers of the company. Those who understand the culture of Lean understand that this is a huge issue, in that the two most basic pillars of Lean are lacking, which cripples any sort of progress or improvement trying to be made. To say that I am much more happy and satisfied in my work now is an understatement, but I do hope that my old work-place embraces Lean for the better, for the sake of those who continue to work there. Looking back at the two different work environments, and the two different attitudes that I attend work with each day, I can already personally see the difference Lean has made in my life.

Once learning about Lean, I began applying it immediately to my every-day schedule. Not only because I would have to be familiar with Lean tools at work, but also because they are good tools to use anywhere and the more familiar I am in applying them, the better. Thinking Lean is not a mindset that is only adopted in certain situations, but it is a mindset that you continue to use and apply all day, everyday. I can personally say, the transition to the Lean mindset was extremely easy and beneficial. Everyday, I find something I can improve on, and I try to take one more Lean step forward.

In terms of the future, I already have a head-start, thanks to the implementations I have made with Lean thus far. However, this does not mean my Lean journey is done, in fact it is far from being over. One of the best parts about Lean is that there is no limits to its application, the possibilities are truly endless. Endless! As said by Maria Calcagni  in “Gemba Kaizen”, by author Masaaki Imai,  “It is not the idea that something is wrong, but that it can be better”(pg 96). There is always room for improvement, always some process in life that can be made more efficient or effective.

And so, I will take my Lean journey and think of how it would have helped my past, allowing me to know where to start applying it in the present, and continue to let Lean guide me through the future.

What is a PIC

Very recently, I was given the opportunity to write a blog post for the Michigan Lean Consortium’s newsletter. In that blog post I wrote about how Michigan Tech is bringing lean to students, but more specifically on the Process Improvement Coordinators, commonly know as the PICs. While writing, it dawned on me that we have never really talked in depth about what our PICs do for the Office of Continuous Improvement.

Lately, we have been introducing a few new members to our PIC  team: Blake, Dominique, and not too long before them we had Matt. Even further back in time than Matt, we introduced Ari in April and Anita in March. In this time frame, Anita and Matt went their separate ways to prioritize other things in their lives. For me, Rylie, I was introduced way back in March of 2016.

Overall you’ve gotten to know a little about each of us, and hear from us during our journey with the office. However, what is it that we actually do for the office? What is our contribution? Where does our value lie?

Well the answer is sort of simple, we are process improvement coordinators for kaizen events. This means that we are responsible to make sure that all of the right people are in the right place, at the right time, and with the all of materials they need to be successful. We work closely with all levels of faculty and staff through the use of lean methods and thinking. We are well respected by these employees and are treated as equivalents whenever we’re seated at the table. On average, once each PIC is well out of their training they can be assigned eight different kaizens that they are coordinating. Deviating away from this part of our role, the PICs can also be responsible for aiding in facilitation of a kaizen,  data collection, and creating presentations for reporting out.

Kaizens are what we all know how to do, but there’s a lot more projects that us PICs are involved in; this is variable depending on which PIC you are talking about. For example, Blake and Dominique just completed training and are starting to get into kaizens. Ari and Dominique are currently working on a question bank for our facilitators to study for the Lean Bronze Certification test, a nationally recognized certification. Ari is also working on coordinating a information session on lean for students taught by the PICs. My big on-going project is training in the new PICs. This is done through a course that I designed along side a former PIC, Aspen, to accommodate all learning styles while enabling coaching opportunities for our more seasoned PICS.

The last bit of what we do is our routine standard work: blog posts, newsletters, report-outs, presentations, keeping up with kaizens and our access database, the typical. The key with our work, however, is that we don’t only do our work, we are continuously improving it through the PDCA cycle. As a team we have decided to highly boost the lean culture of mutual respect, by asking lots of questions and eliminating blame from our work.

In summary, our PICs are always on the go, and our “typical” day in the office is really unpredictable. Each day is different, and that’s how we like it, as it allows for growth and things to get done, without the lag of a droning routine.